Opcenter

Opcenter Scheduling

Opcenter Scheduling software creates production schedules based on availability of resources, constraints and materials required by the order.

Contact us to learn how to purchase this product in
Change country

opcenter-scheduling-promo-640x480

Advanced Scheduling reduces downtime and cost

Opcenter Advanced Scheduling provides an accurate model of the production environment. This helps you increase resource utilization and on-time delivery.

Order-based multi-constraint scheduling (standard)

Create order-based schedules. Rank or weigh items to prioritize orders. Sequencing algorithms take into account resource availability and additional constraints the order requires. Schedules can account for different operation run speeds on resources. Apply sequence dependent changeover times based on an operation’s attributes and allow overlaps and slack time between operations.

multi-constraint-feature

Advanced constraint modeling (professional)

Model advanced resource constraints, such as rules about concurrent rule usage. Advanced inter-operation constraints include limits on the time between operations and how much operation times can be extended. With Advanced Schedule Optimization, you can define additional schedule optimization rules to deal with problems such as minimizing changeover times, preferred sequencing, and campaigning.

A worker working on advanced constraint features.

Advanced material modeling (professional)

Implement custom rules about how materials are consumed to ensure that sub-assemblies and raw materials are used according to business rules. When allocating materials, the system filters and ranks data to allow quality-related or customer-specific material usage constraints to be included.

advanced-material-feature

Assembly process visualization (professional)

Visualize the assembly process from raw materials through to finished goods and sales orders. The Material Explorer shows a graphical view of the material dependencies as well as plots of stock levels over time. See where shortages will occur and choose to keep them as a constraint, or ignore them.

assembly-process-feature

Interactive schedule viewing (ultimate viewer)

Sales offices use viewers to track the progress of orders. Carry out order inquiries against a read-only copy of the published schedule. Management can compare actual times with scheduled completion times to assess performance of the production process. On a shop floor, cell supervisor or machine operator can use viewer to see up-to-the-minute work to-lists.

Asset - Interactive Schedule Viewing (Ultimate Viewer)
Case Study

Dauper

Dauper uses Opcenter APS to make production scheduling 300 times faster
Case Study

Dauper uses Opcenter APS to make production scheduling 300 times faster

Company:Dauper

Industry:Consumer Products & Retail

Location:Canela, Rio Grande do Sul, Brazil

Siemens Software:Opcenter APS

Learn more

System requirements

Seventh generation Intel Core i5 processor
16GB random access memory (RAM)
Double the amount of RAM for virtual memory (paging file size)
50GB disk space
Windows 10

System Requirements